We started this job in late February 2020 and had a 14week program, due to the covid shutdown the site closed for 10 weeks from March to mid May.
The works involve turning 2no. empty retail units into 5no. 2 & 3 bedroom apartments and landlord areas. We have co-ordinated and fully installed all LV power & ELV data, tv & fire alarm electrical systems in all 5 apartments. We had bespoke ESB meter cabinets built specifically for this project by our panel supplier Argand Ltd. We have installed a new air sampling fire system in the landlord area and added new fire detection and alarm devices for the additional apartments and landlord areas.
We have also been contracted to fully upgrade the existing access control system to the entire apartment complex and install a fire alarm network across all fire alarm panels in the complex. We have Mains Security Ltd and Red Fire Protection Ltd installing & commissioning the camera's, access control systems and fire alarm network.
This project started in late August 2020 with the installation of an entire new fire alarm system and network in the production warehouse area. Since our successful handover of the fire alarm with our close suppliers Red Fire Protection Ltd, we have been contracted to upgrade existing LV systems throughout the plant. We have installed new 110V , 240V & 380V sockets throughout the production area. We have had new industrial Fuse Boards built specifically for this client by our supplier Argand Ltd. The new fuseboards have been designed for 110V , 240V & 400V power distribution for the very busy production areas.
During our time in Dannan we have been asked on a number of occasions to assist with urgent electrical installations that the client requires. These requests are acted upon immediately by the Red Electrical Site team to ensure our clients needs are met in a safe & efficient manner.
We are currently replacing and installing new lighting and emergency lighting throughout the entire plant area. These emergency lighting systems will be commissioned by our partners in Red Fire Protection Ltd. We are also rewiring and replacing external building mounted lights with new energy efficient high output LED flood lights
We are also at present surveying the external lighting around the extensive plant. These works will involve testing existing electrical cables at all 35 lamp posts, replacing all lampost heads from existing SON type lamp heads to more energy efficient LED type.
Lighting- Old fluorescent tube lights replaced with new warm white LED panel lights. These light with brighten up the shop and are more energy efficient and cost effective.
Sockets- Additional sockets added to de clutter area and get rid of extension lead. Fast charge usb sockets added above counter for phones, tablets
Old 600x600 fluorescent light fittings replaced with New Bright White Led panels. Also old 8ft fluorescent light fittings replaced with 150watt high bay LED lights. This job was carried out in a warehouse that uses various woodwork machinery. The lighting levels were not sufficient prior to the upgrade. The light levels on the factory floor are now significantly brighter thus making it safer for the staff to work. As well as this the new lights are far more cost effective and energy efficient.